Renner Road under Shawnee Mission Parkway
Name Renner Road under Shawnee Mission Parkway
Date Updated 11-07-2019
Contact Cynthia Moeller-Krass, P.E.
Project Status Construction
Description It is intended that the entire stormwater collection system at the Renner Road level be replaced or
lined. We are planning to  line the conveyance lines from the elevated grade along Shawnee Mission
Parkway. Both of these sections of roadway are
City ROW and maintenance responsibility.
Status Details  Amino Brothers Company began construction on 10-15-2019.  Renner Road will be fully closed to all traffic between 65th Street and 66th Terrace. 
Contact Phone 913-742-6236
Contact Email cmoeller-krass@cityofshawnee.org
This Is a City Project
Number 3459
This Is a Capital Improvement Project
Project Category Drainage Improvements
Design Firm BHC Rhodes
Construction Contract Amino Brothers Company
Inspection Firm BHC RHodes
Start Date 10-15-2019
Estimated End Date 01-31-2020
Project Notices
File Name
Download
20190507_DRAFT_RENNER RD_R.pdf
3459_Renner Rd_Final Plans Resident letter_06062019.pdf
PN3459 - FINAL PLANS_RENNER RD DRAINAGE_UNSIGNED.pdf
Project Images
File Name
View
Download
20181029_104942.jpg
20181029_105238.jpg
20181029_105641.jpg
Silk UI Framework Simulation Device
Resize the window to preview the page in target devices.
Open the settings to change the simulation device options.