Project List
Name
Date Updated
ContactProject Status
This Is a City Project
2019 Mill and Overlay
07-17-2019
Kevin ManningConstruction
2019 Stormwater Pipe Repair 
11-07-2019
Cynthia Moeller-Krass, P.E.Construction
2019 Streambank Stabilization Project
11-07-2019
Cynthia Moeller-Krass, P.E.Design
2020 Stormwater Pipe Repair Project
11-07-2019
Cynthia Moeller-Krass, P.E.Design
52nd Street and Woodland Drive - Storm Drainage Improvements
11-06-2019
Ernie Longoria, P.E., PTOEDesign
6200 Block of Nieman Road Culverts
12-12-2019
Cynthia Moeller-Krass, P.E.Construction
71st Street Sidewalk Improvements 
08-30-2019
Kevin ManningDesign
75th Street Corridor Improvement Project - Switzer to Quivira
11-04-2019
Paul Lindstrom, P.E.Design
Bellmont Promenade (Lot 1)
08-12-2019
Doug AllmonFuture
Bellmont Promenade Residential (Lot 2)
11-22-2019
Doug AllmonFuture
Blackfish Parkway & Hauser Road - Storm Drainage Improvements
11-06-2019
Ernie Longoria, P.E., PTOEConstruction
Bristol Highlands North
08-12-2019
Doug AllmonDesign
Calamar Willow Ridge Senior Living
08-12-2019
Doug AllmonConstruction
Coleman Worldwide Moving
08-12-2019
Doug AllmonConstruction
Dance Expressions
08-12-2019
Doug AllmonConstruction
Hilltop Sidewalk Improvements
09-04-2019
Kevin ManningDesign
HyVee Renovation at 63rd & Pflumm
08-12-2019
Stephanie MalmborgConstruction
I-435 and Johnson Drive Traffic Study
07-17-2019
Kevin ManningFuture
Jim Allen Aquatic Center Filtration System Replacement
11-08-2019
Bert Schnettgoecke, P.E.Design
Johnson Drive & Widmer Street - Storm Drainage Improvements
11-06-2019
Ernie Longoria, P.E., PTOEConstruction
JW Motorsports in Perimeter Park
08-12-2019
Doug AllmonDesign
Kenneth Estates - 12700 Block of W. 71st Street
08-15-2019
Mark ZielsdorfConstruction
KinderCare at Johnson & Woodsonia
12-11-2019
Stephanie MalmborgConstruction
Mill Valley High School Addition
12-11-2019
Stephanie MalmborgConstruction
Monticello Road (Phase 1) - 71st Terrace to Shawnee Mission Parkway
11-04-2019
Paul Lindstrom, P.E.Design
Nieman Corridor Middle Storm Drainage Improvements
12-12-2019
Cynthia Moeller-Krass, P.E.Construction
Nieman Corridor North Storm Drainage Improvements
12-12-2019
Cynthia Moeller-Krass, P.E.Construction
Nieman Road Improvements - 55th to Shawnee Mission Parkway
11-04-2019
Paul Lindstrom, P.E.Construction
Parkway Village Lot 3 - NW Corner of 65th and Barker
12-11-2019
Stephanie MalmborgDesign
Pflumm Road Rehabilitation - Midland Drive to South City Limits
11-04-2019
Paul Lindstrom, P.E.Future
Project Homeland #1 (43rd Street, West of K-7)
12-11-2019
Stephanie MalmborgFuture
Project Homeland #2 (43rd Street, West of K-7)
12-11-2019
Stephanie MalmborgFuture
Public Works Service Center Office Improvements
11-06-2019
Brian DaileyConstruction
Quivira Drive and Park Street - Storm Drainage Improvements
11-06-2019
Ernie Longoria, P.E., PTOEConstruction
Renner Road under Shawnee Mission Parkway
11-07-2019
Cynthia Moeller-Krass, P.E.Construction
Schier Headquarters at Woodland & Shawnee Mission Parkway
12-11-2019
Stephanie MalmborgConstruction
Seven Hills Lake Culvert and Stormwater Pipe Repair
11-07-2019
Cynthia Moeller-KrassConstruction
Shawnee Town 1929 Town Hall Facility Improvements Project
11-06-2019
Brian DaileyDesign
Stag's Spring
10-08-2019
Mark ZielsdorfDesign
The Cottages At Shawnee
08-12-2019
Doug AllmonConstruction
Veteran's Park Senior Residential
08-12-2019
Mark ZielsdorfDesign
Victory Assembly of God Church
08-12-2019
Doug AllmonDesign
Westar Substation
08-12-2019
Doug AllmonDesign
Westbrooke Green
08-12-2019
Doug AllmonDesign
Woodsonia Apartments and Townhomes
08-12-2019
Mark ZielsdorfFuture
45 records
Silk UI Framework Simulation Device
Resize the window to preview the page in target devices.
Open the settings to change the simulation device options.