Name |
52nd Street and Woodland Drive - Storm Drainage Improvements |
Date Updated |
11-16-2020 |
Contact |
Ernie Longoria, P.E., PTOE |
Project Status |
Construction |
Description |
Two (2) corrugated metal pipes beneath 52nd Street have reached the end of their service life and need to be replaced / relined. A survey will be completed from centerline of Woodland to approximately 300 ft west and from triple culverts to 250 LF south of W. 52nd St including determining low opening elevations for first 3 homes on W. 52nd St. identified as being in the City floodplain. The survey will also be used to determine limits of floodplain as a result of the Woodland Drive expansion and subsequent house removal and grading at 20700 W. 52nd St. |
Status Details |
Construction is complete on upstream concrete ditchliner, culvert replacement, transition structure, and downstream channel trash screens. Final stabilization for sod complete in September.
Working on project closeout and final change order processes. Reviewing validity of contractor's request for additional days to be added to the schedule. |
Contact Phone |
913.742.6312 |
Contact Email |
elongoria@cityofshawnee.org |
This Is a City Project |
|
Number |
3463 |
This Is a Capital Improvement Project |
|
Project Category |
Drainage Improvements |
Design Firm |
Phelps Engineering, Inc. |
Construction Contract |
VF Anderson Builders LLC |
Inspection Firm |
Phelps Engineering, Inc. |
Start Date |
12-19-2018 |
Estimated End Date |
09-30-2020 |